{"id":1309,"date":"2022-05-11T04:49:59","date_gmt":"2022-05-11T04:49:59","guid":{"rendered":"http:\/\/fra.com.vn\/en\/?p=1309"},"modified":"2022-06-08T16:16:11","modified_gmt":"2022-06-08T09:16:11","slug":"may-hut-mui-doc-lap-la-gi-co-phai-la-may-hut-mui-dao-khong","status":"publish","type":"post","link":"https:\/\/fra.com.vn\/en\/may-hut-mui-doc-lap-la-gi-co-phai-la-may-hut-mui-dao-khong\/","title":{"rendered":"IMPROVING THE LOAD CAPACITY OF THE 220KV SON LA &#8211; VIET TRI TRANSMISSION LINE"},"content":{"rendered":"<p><strong><span>The project to increase the load capacity of the 220kV Son La &#8211; Viet Tri transmission line was started on the morning of March 30 by the Power Transmission Project Management Board (under the National Power Transmission Corporation) and contractors. in Son La.<\/span><\/strong><\/p>\n<p><span>According to the plan, the work will be completed and put into use by the end of 2022. The project is implemented on the existing 220kV Son La &#8211; Viet Tri transmission line passing through Son La and Phu Tho provinces with a length of about approx. 167km.<\/span><\/p>\n<p><span>The project has a total investment of more than 357 billion VND, invested by the National Power Transmission Corporation.<\/span><\/p>\n<table cellspacing=\"1\" cellpadding=\"10\" align=\"center\">\n<tbody>\n<tr>\n<td><img src=\"https:\/\/www.evn.com.vn\/userfile\/User\/xuantien\/images\/2022\/3\/Anh1KhoicongVIetTri3032022.jpg\" alt=\"\" \/><img loading=\"lazy\" class=\"alignnone size-medium wp-image-1653\" src=\"http:\/\/fra.com.vn\/en\/wp-content\/uploads\/2022\/05\/son-la-1-653x400.jpg\" alt=\"\" width=\"653\" height=\"400\" srcset=\"https:\/\/fra.com.vn\/en\/wp-content\/uploads\/2022\/05\/son-la-1-653x400.jpg 653w, https:\/\/fra.com.vn\/en\/wp-content\/uploads\/2022\/05\/son-la-1-768x471.jpg 768w, https:\/\/fra.com.vn\/en\/wp-content\/uploads\/2022\/05\/son-la-1.jpg 1000w\" sizes=\"(max-width: 653px) 100vw, 653px\" \/><\/p>\n<p><em>Delegates performed the roundbreaking ceremony to increase the load capacity of the 220kV Son La &#8211; Viet Tri transmission line<\/em><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span>Some items in the project such as: replacing the existing ACSR 400\/52 steel core aluminum conductor with a composite core superheater with a cross section of 421mm\u00a0<\/span><sup><span>2\u00a0<\/span><\/sup><span>\u00a0aluminum or equivalent, especially for the crossing of the Red River using composite core superheater wire. enhanced section aluminum section 524mm\u00a0<\/span><sup><span>2<\/span><\/sup><span>\u00a0\u00a0or equivalent.<\/span><\/p>\n<table cellspacing=\"1\" cellpadding=\"10\" align=\"center\">\n<tbody>\n<tr>\n<td><img src=\"https:\/\/www.evn.com.vn\/userfile\/User\/xuantien\/images\/2022\/3\/Anh2KhoicongVietTri3032022(1).jpg\" alt=\"\" \/><img loading=\"lazy\" class=\"alignnone size-medium wp-image-1654\" src=\"http:\/\/fra.com.vn\/en\/wp-content\/uploads\/2022\/05\/son-la-2-721x400.jpg\" alt=\"\" width=\"721\" height=\"400\" srcset=\"https:\/\/fra.com.vn\/en\/wp-content\/uploads\/2022\/05\/son-la-2-721x400.jpg 721w, https:\/\/fra.com.vn\/en\/wp-content\/uploads\/2022\/05\/son-la-2-768x426.jpg 768w, https:\/\/fra.com.vn\/en\/wp-content\/uploads\/2022\/05\/son-la-2.jpg 1000w\" sizes=\"(max-width: 721px) 100vw, 721px\" \/><\/p>\n<p><em><span>Existing 220kV Son La &#8211; Viet Tri transmission line<\/span><\/em><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<div class=\"box__cont\">\n<div class=\"boxx__content__single\">\n<div class=\"box__nth_2\">\n<p><span>According to Mr. Vo Luong Nhan &#8211; Deputy Director of the Power Transmission Project Management Board, the project is invested to enhance transmission capacity, contributing to releasing the full capacity of hydropower plants in Son La province. meet the demand for load growth in service of socio-economic development in Son La, Phu Tho and northern provinces.\u00a0In addition, enhancing the safe and stable operation of the national power system.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<div id=\"fb-root\" class=\" fb_reset\">\n<div>\n<div><\/div>\n<\/div>\n<\/div>\n<div class=\"fb-comments fb_iframe_widget fb_iframe_widget_fluid_desktop\" data-href=\"https:\/\/fra.com.vn\/may-hut-mui-doc-lap-la-gi-co-phai-la-may-hut-mui-dao-khong\/\" data-width=\"100%\" data-numposts=\"5\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>The project to increase the load capacity of the 220kV Son La &#8211; Viet Tri transmission line was started on the morning of March 30 by the Power Transmission Project Management Board (under the National Power Transmission Corporation) and contractors. in Son La. According to the plan, the work will be completed and put into [&#8230;]\n","protected":false},"author":1,"featured_media":1653,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1,134,87,73,89,132,131],"tags":[],"_links":{"self":[{"href":"https:\/\/fra.com.vn\/en\/wp-json\/wp\/v2\/posts\/1309"}],"collection":[{"href":"https:\/\/fra.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/fra.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/fra.com.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/fra.com.vn\/en\/wp-json\/wp\/v2\/comments?post=1309"}],"version-history":[{"count":4,"href":"https:\/\/fra.com.vn\/en\/wp-json\/wp\/v2\/posts\/1309\/revisions"}],"predecessor-version":[{"id":2583,"href":"https:\/\/fra.com.vn\/en\/wp-json\/wp\/v2\/posts\/1309\/revisions\/2583"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/fra.com.vn\/en\/wp-json\/wp\/v2\/media\/1653"}],"wp:attachment":[{"href":"https:\/\/fra.com.vn\/en\/wp-json\/wp\/v2\/media?parent=1309"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/fra.com.vn\/en\/wp-json\/wp\/v2\/categories?post=1309"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/fra.com.vn\/en\/wp-json\/wp\/v2\/tags?post=1309"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}